Winter 2026: Will porta potty antifreeze work below 20°F?
We have a 40-story high-rise going up in Chicago, with 120 workers on site daily through January. The ground is paved but exposed, and the…
57 questions across all categories.
We have a 40-story high-rise going up in Chicago, with 120 workers on site daily through January. The ground is paved but exposed, and the…
A high-rise portable toilet is a standard portable toilet designed for lifting by a crane to upper floors of a building under construction. It is…
I'm managing a 22-story high-rise project where crane time is a premium. Safety is pushing for portable toilets on every fourth floor to minimize…
A high-rise unit is serviced from the ground using a dedicated waste line. The waste line is a large-diameter pipe, usually 4 to 6 inches, that runs…
Nine years driving a vacuum truck, and I've seen it all. Last month, I had to service a standard unit perched on a half-finished bridge deck, 200…
After nine years driving a vacuum truck, I’ve placed a standard unit in some strange spots. The weirdest was on a narrow scaffold ledge for a…
We're running a 12-story build in Phoenix and have a standard portable toilet on the 8th floor for a crew of 30. It's a long-term rental with weekly…
We have a concrete pour crew of 15 guys working on the 15th floor of a high-rise in Phoenix. The job will last eight weeks. The elevator core is in,…
I have a standard portable toilet on the 15th floor for a crew of 40. The elevator is scheduled for maintenance next week, which means the vacuum…
We're on a tight downtown infill site, a 12-story residential build on a half-block lot. The fence line is tight to the sidewalk, and the only open…
We are starting a three-story commercial building in downtown. The crew will be on the roof for six weeks. The street is too narrow for a crane to…
We have a high-rise unit on the 15th floor of a commercial job. It's a standard unit, the kind with a 60-gallon holding tank. The elevator is…
We're 18 floors up on a high-rise project in Phoenix with a standard portable toilet on the slab. The crew is 50 guys, five days a week. The elevator…
We have a standard unit on the 12th floor of a steel-frame high-rise. It's there for a crew of about 30 working daily. The rental company has been…
An empty deluxe portable toilet weighs around 300 to 400 pounds. That is more than a standard unit, which typically weighs about 200 pounds empty.…
High-rise unit servicing when the building elevator is down. Our site is a 30-story high-rise, and we have a standard portable toilet on the 25th…
A standard portable toilet weighs about 200 pounds empty and up to 1,000 pounds when full. The holding tank capacity is 50 to 70 gallons, and water…
I've seen some wild setups over nine years driving a vacuum truck. Once, we had to crane a standard portable toilet onto a high-rise construction…
I'm running a 24-story tower in Phoenix. We have 125 workers on site. The only construction elevator went down yesterday and the repair is going to…
We have a standard unit on the 15th floor of a high-rise build in Phoenix. The crew of 60 uses it daily. Our rental company does the weekly service…
We've got a 24-story commercial build downtown. The crew is about 60 people working eight-hour shifts. We have a standard portable toilet and an…
We're placing a portable toilet on a rooftop deck for a six-week residential addition. The crane lift is tight, so I need the empty weight of an…
After nine years driving a vacuum truck in Akron, I've hauled units to some wild spots. Once placed a standard portable toilet halfway up a muddy…
We're 12 weeks into a 30-story build in downtown Phoenix. The crew is 150 strong, working six 10-hour days. We have four standard portable toilets…
We've got a 40-story high-rise under construction in Phoenix. The exterior elevator is down for two weeks, and the standard portable toilets on the…