High-rise unit on the 15th floor: what's the service plan?
We have a concrete pour crew of 15 guys working on the 15th floor of a high-rise in Phoenix. The job will last eight weeks. The elevator core is in, but there's no permanent plumbing yet. We need a unit up there now.
The rental company dropped a standard unit with a crane. It's on level deck, staked down for the wind. But nobody has told me how the vacuum truck is supposed to service it. The hose won't reach from the street.
Do they pump it on-site with a smaller portable tank and then lower that? Does the waste get pumped down a dedicated chute? What's the standard service plan for a high-rise unit, and how does the frequency change?