Crane-lifted porta potty: what special prep does it need?
We are starting a three-story commercial building in downtown. The crew will be on the roof for six weeks. The street is too narrow for a crane to swing a unit onto the roof from the ground, so we are lifting it with a smaller crane from the fifth floor up. The unit is a standard unit. It will be exposed to wind up there.
I need to know what special prep a unit needs for a crane lift. Are there designated tie-down points on a standard unit? Do I need to ask the rental company for a reinforced model? What about securing it on the rooftop? The crew is 12 guys. They will not have access to ground-level units once the lift is done.
What are the structural requirements for a lifted unit?