Porta Potty Forum

Six-month garage build: what if we need to move the porta potty mid-project?

Sam O.asked 1 viewHome Renovations & Long-termLong term rentalPlacementDelivery feeStandard unitTruck access

We're six weeks into a six-month garage build and have a standard portable toilet on site for our crew of five. It's sitting on gravel right now, and the truck access is good. The problem is the next phase of construction requires that exact spot for materials staging. I need to move the unit about 50 feet to a different part of the driveway, which is also level gravel with truck access. What's the process for relocating a porta potty mid-rental? Do I call the rental company to move it, or can we slide it ourselves if it's empty? And does moving it usually trigger a separate fee, or is it part of the service?

1 answer

Sorted by votes
0
Brad L.Kansas City, MO

Call the rental company and have the driver move it on your next scheduled service visit, right after he pumps it. That's how we handle it on garage and addition jobs whenever staging takes over the original spot.

Even an "empty" unit isn't empty. After a pump out the driver puts fresh charge water and deodorizer back in the tank, so you're still sliding a top heavy box with liquid sloshing in the bottom. Drag a standard unit across gravel and you risk tipping it or cracking the skids, and most rental agreements put that damage on you.

When you call, give them three things: the date the spot has to be clear, the new location, and confirmation that the vacuum truck can still pull up close to it. Fifty feet down the same gravel driveway is an easy move for a driver who is already on site. Ask whether it gets folded into the service stop or billed as a separate trip, since that varies by operator, and have them note the answer on the invoice.

While you're at it, face the door away from the staging area so nobody backs a load of lumber into it. If you get wind out there, have the driver stake or strap it again after the move.

We've done this a bunch of times and the crew never went a day without a working unit.

Your answer

Log in or create a free account to answer this question.