What's the main difference between a high-rise unit and a regular one besides the lift?
My GC just ordered a high-rise unit for the 12th floor of our project. I've handled plenty of standard units on the ground, but this is my first time…
My GC just ordered a high-rise unit for the 12th floor of our project. I've handled plenty of standard units on the ground, but this is my first time…
We're breaking ground on a 40-story tower in Chicago next January. The crew will be around 150 people, working five days a week for two years. We'll…
We've got a 40-story high-rise under construction in Phoenix. The exterior elevator is down for two weeks, and the standard portable toilets on the…
We have a high-rise unit on the 15th floor of a commercial job. It's a standard unit, the kind with a 60-gallon holding tank. The elevator is…
We have a standard portable toilet on the 40th floor of a high-rise construction site. It's been there for three weeks with weekly service, but the…
We have a concrete pour crew of 15 guys working on the 15th floor of a high-rise in Phoenix. The job will last eight weeks. The elevator core is in,…
We're running a 12-story build in Phoenix and have a standard portable toilet on the 8th floor for a crew of 30. It's a long-term rental with weekly…
We're on a 40-story high-rise in Chicago, winter 2026. The crew is 150 people, five days a week. We have a cluster of standard units and one…
We're 18 floors up on a high-rise project in Phoenix with a standard portable toilet on the slab. The crew is 50 guys, five days a week. The elevator…
I have a standard portable toilet on the 15th floor for a crew of 40. The elevator is scheduled for maintenance next week, which means the vacuum…
High-rise unit servicing when the building elevator is down. Our site is a 30-story high-rise, and we have a standard portable toilet on the 25th…
A high-rise unit is serviced from the ground using a dedicated waste line. The waste line is a large-diameter pipe, usually 4 to 6 inches, that runs…
We have a standard unit on the 12th floor of a steel-frame high-rise. It's there for a crew of about 30 working daily. The rental company has been…
OSHA 1926.51 does not require a portable toilet on the roof for a 10-man crew doing facade work. The standard is based on total worker count at the…
Got a notice the PSAI updated their driver certification program. The last time I sent a driver through, it was mostly pumping basics and disposal…
A high-rise portable toilet is a standard portable toilet designed for lifting by a crane to upper floors of a building under construction. It is…
OSHA 29 CFR 1926.51(c) requires one toilet seat and one urinal per 40 workers for a construction crew of 20 to 199 people. For your framing crew of…
OSHA 1926.51(c) requires at least two standard portable toilets for a 50-person construction crew. The standard mandates one toilet seat and one…
One standard portable toilet is enough for a 25-person crew on your three-story building. This meets the minimum requirement of OSHA 29 CFR 1926.51.…
A standard portable toilet weighs about 200 pounds empty and up to 1,000 pounds when full. The holding tank capacity is 50 to 70 gallons, and water…